Jump to the main content block

Last Update

2026-07-22

The Swallow Nests

Picture description

 

The Swallow Nests

Introduction:Basic Information

Artist:Lee, Yi-hsun

Dimensions:length 368cm、width 488cm、height 168cm

Medium:Mosaic Ceramic, RC

Year:2014

 

Artist's Interpretation

The design idea is inspired by the location of the University, Yan-Chao. The artwork showcases the topographic features and landforms of the Yan-Chao Campus, including the undulating hills, winding streams and bushy woods. It signifies the harmony of the natural and cultural environment, which is embodied by curves of organic shapes. The swallows, along with the combination of real and virtual spaces, suggests the connection between the swallow nests and the location of the University. Swallows, furthermore, are considered symbols of the students. The group of swallows, therefore, also suggests the gathering of elites in the University.

 

Production Process:

Steel framework structure

 ↑Steel framework structure

Steel structure for swallow component

 ↑Steel structure (Swallow)

Base model shaping

 ↑Base model shaping

Base model shaping for swallow component

 ↑Base model shaping (Swallow)

Handcrafted mosaic cutting partial view 1

 ↑Handcrafted mosaic cutting (Partial view)

Handcrafted mosaic cutting partial view 2

 ↑Handcrafted mosaic cutting (Partial view)

Handcrafted mosaic cutting partial view 3

 ↑Handcrafted mosaic cutting (Partial view)

Paper backing process for swallow component

 ↑Paper backing (Swallow)

Mosaic installation on swallow component

 ↑Mosaic installation (Swallow)

Grouting work on swallow component

 ↑Grouting work (Swallow)

Applying adhesive material

 ↑Applying adhesive

Mosaic installation on upper section

 ↑Mosaic installation (Upper section)

Assembling swallow component onto main artwork structure

 ↑Assembling swallow component onto artwork

Completed mosaic installation on upper section

 ↑Completed mosaic installation (Upper section)

Mosaic installation on lower section

 ↑Mosaic installation (Lower section)

Adjusting mosaic tile gaps

 ↑Adjusting mosaic gaps

Grouting work on upper section

 ↑Grouting work (Upper section)

Grouting work on lower section

 ↑Grouting work (Lower section)

 

On-site Installation:

Tree transplantation at site

↑Tree transplantation

Completed tree transplantation at site

↑Completed tree transplantation

Foundation cutting at site

↑Foundation cutting

Foundation excavation at site

↑Foundation excavation

Securing base structural alignment using rebar reinforcement

↑Securing base placement with rebar reinforcement

Base frame installation

↑Base installation

Base concrete grouting process

↑Base grouting

On-site artwork structural setup

↑On-site artwork installation

On-site mosaic tile touch-ups

↑On-site mosaic touch-ups

Cleaning mosaic tile surface using sponge

↑Cleaning tile surface with sponge

 

Finished Product:

Completed public artwork front view

↑Completed artwork front view

Completed public artwork left side view

↑Completed artwork left side view

Completed public artwork right side view

↑Completed artwork right side view

Artwork design detail close up view 1

↑Artwork design details

Artwork design detail close up view 2

↑Artwork design details

Completed public artwork presented with descriptive plaque

↑Completed artwork and descriptive plaque

Descriptive plaque close up view

↑Descriptive plaque

 

Login Success